Single-storey timber house with a covered terrace in a meadow at dusk
Ecological house-building and development

Thirty years of knowledge about the timber house — now an open system of realisation

We built the technology, the project library and the knowledge base on our own production. Now we connect partners — factories, designers, crews, developers, investors — to the realisation of houses and settlements through one information platform.

~1 300houses confirmed by archive documents, 1994–2015; estimated over 2,000
160+objects produced in Latvia, over 700 projects worked out
6production loops proven on a working factory
11platform centers — the full life cycle of a house

Visualisation

Start here

Who are you?

The platform connects those who can with those who need. Pick your entry.

Knowledge · Austria + Latvia

A knowledge base that cannot be bought in a year

Behind the platform stands the archive of the Austrian school of timber house-building, 1994–2015, and our own production in Latvia since 2017. For every object we know what was designed, what was produced, what went wrong and what it taught.

~1 300

houses confirmed by archive documents 1994–2015: from micro-cabins to schools, hotels and estates. Estimated over 2,000 including years without data.

891

projects in the Latvian registry 2017–2026: 160+ produced, over 700 worked out and calculated, 355 price requests, actual cost by production stage.

6

production loops of a working factory: timber processing · glulam and CLT gluing · CNC · packing and logistics · assembly · turn-key finishing.

Drawings and types

A library of details and standard houses: the 2026 catalogue — 15 models on show, 38 in the library; types and assemblies with parameters, author and version.

Estimates and cost

IPPA 11 calculation rules v1.1, actual cost per object, labour norms for six delivery types. The price is counted from the model, not by hand.

Lessons

Every defect becomes a lesson and a new version of a library element. That is the difference between an archive and a knowledge base.

Technology

The eco-frame: glulam carries, CLT stiffens, the eco-panel encloses

One material system for a cabin, a house and a 3–5 storey residential building. A 1200 / 2400 mm grid, numbered parts, assembly by a small crew.

Exploded isometric of the inner frame: glulam portal frames and 60 mm CLT boards
Inner frame

GLT portal frames + 60 mm CLT boards

Glulam carries the loads, a thin CLT board provides diaphragm stiffness. Elements follow the grid, a 2400 × 6000 panel is cut with almost no waste, and a board weighs little enough to be lifted by two people.

Status of the CLT Light 60 assembly: concept — Eurocode 5 calculations and the European assessment (ETA) are in progress.

Envelope · rule E1

Eco-frame panels without OSB, plywood, LVL or mineral wool

A timber frame with wood-fibre and cellulose insulation, factory-made, numbered. Rule E1 is blocking: an estimate with a banned material does not pass the check.

Embodied carbon and energy are calculated per object under EN 15978 — as mandatory fields, not as a slogan.

Isometric of the outer frame with roof and prefabricated external panels
Six delivery types

The delivery type is a parameter of the product, not a separate business

1Frame on site
2Frame panels
3Frame modules
4CLT large panels
5CLT modules
6CLT Light + eco-frame
All components of a house laid out by layer

Kit of Parts: the house arrives as numbered components. Visualisation.

Production

From our own factory — to a network of partner factories

The technology was moved from Austria to Latvia together with the rights. On our own production we ran the tests, collected cost by production stage and built the knowledge base. That stage is complete: now we connect partners in production and in the other centers to realisation.

Delivery model: CLT and GLT gluing in one place, CNC cutting at partners with suitable machines. A factory connects with a passport — equipment, tolerances, quality control, DoP/CE documents — and receives orders against a frozen specification.

1

Factory passport

Machines, thicknesses, glue, press, tolerances, QC, certificates.

2

Order by specification

A frozen design version, BTL/Cadwork, a production window of ±3 days.

3

Acceptance and payment

QC, DoP/CE, packing in assembly order — payment after the kit is accepted.

Connect a factory
Projects we have worked out

Three product lines from one system

Cabins for tourism, houses for a family and 3–5 storey residential buildings. Every project carries an honest status: ready, concept or archive.

Covered terrace of a compact unit with guests
TourismDesign ready

Cabins and units for tourism

A 22.8 m² modular cabin with a full drawing set and specification; a cabin series 3×4…4×6 with four roof types; units up to 68 m² on the 2400 grid.

Isometric view of the 84 m² house
HomesPlans ready

Houses of 68 / 84 / 120 m²

Three types on one grid; the 120 m² house is built in two phases and grows with the family. A library of modular series — 40 models in reserve for recalculation.

Isometric of the frame with cladding panels
ApartmentsIn design

Residential buildings of 3–5 storeys

The same system at the scale of a block: spans, fire resistance, acoustics and the stair-and-lift core are validated openly. Looking for the first developer.

The catalogue of ready solutions with prices and delivery scope is a separate site (in preparation). Images are visualisations.

First party in preparation Demo case · Denmark

Twenty houses on one site as one party

The first settlement to pass through the platform in full: one site chain and twenty house chains. A 7.2 × 7.2 m module on the 1200 grid, two house types and a common house.

20

houses: 12 of type 1, 7 of type 2, one common house

40

control points from plot to commissioning; the key gate is the building permit

16

locks — rules written as data: title, economics, library, freeze, payment…

6,4

kg CO₂/m²/year — the BR18 limit from 2027; carbon is counted at every move

What is done

The product is described, 30 scenarios and 11 roles are laid out by center, a materials estimate of ±25 %, the “7.2 × 7.2 constructor” library v0, a nine-phase plan.

What is open

The local development plan needs agreement with the municipality: the exemption path takes about a year to the first house, a new plan up to two years. The legal package with the Danish partner is in progress.

What we learn

A single module does not pay — economics appear from two modules and in a series. BR18 data must be supplied by the contractor, so proof of execution becomes a compliance tool.

Project partners are named after agreements are signed. Statuses and figures as of 01.10.2026.

The information platform of realisation · IPPA 11

Eleven centers, one chain: role → task → proof → acceptance → payment

The platform is an operator, not a builder. It does not run the construction and takes no construction margin: it connects participants, holds one model of the house and checks that every move is confirmed by a person before money flows.

1

Role

Entry to the platform is through a role and declared assets: what you can do and how it is proven.

2

Task

A move in the chain of a house with a price and a deadline, opened only after the previous one.

3

Proof

A photo, a checklist, a document, a model — the artefact without which there is no transition.

4

Acceptance

A person accepts: supervisor, chief engineer, QC, client. Quality and acceptance are never the same person.

5

Payment

Money follows the confirmed result through a licensed provider, not through the platform.

6

Lesson

A verified result returns to the library as a version — and the author receives a royalty for reuse.

Four screens

Who am I · What do I have · Where am I needed · What to do today. Opens on a phone, no implementation consultant.

AI inside the process

Each role has its own assistant: estimator, designer, buyer, lawyer. It sees only its own scope, prepares, checks, warns. A person decides.

Platform status

A six-table core, 40 scenarios, 13 AI-agent packages, a pilot object in Latvia in progress. The first-loop application is in development.

Family on the terrace of a timber house among birch trees
Community · what we build

Not houses one by one, but places where people live together

An eco-settlement means shared spaces, its own energy and water, a garden, rental and sharing, neighbourhood rules. The platform's “Community” center runs residents, guests, reputation and events; the “Service” center — rental, maintenance and warranty after handover.

Residents
the home's page, requests, acceptance, reviews
Guests
booking, occupancy and yield for tourism
Neighbours
the common house, events, eco initiatives
Partners
the first hundred: 500 / 2,000 / 10,000 € a year, no exclusivity

The next loop is IPPA Eco Life: the healthy home, energy, materials, tourism, food, water — eco-living specialists around the house. In preparation.

Team

The people who built the system and the roles we open

Founder

A physicist and physician by education — the faculty of medical physics and bioengineering. Since 2001 in timber house-building and wood protection against decay; development and realisation of ecological house-building, own production in Latvia, the transfer of the Austrian technology and archive. Author of the eleven-center system.

Team and partner names are published with their consent.

Platform

Scenario architect · orchestrator · director

Rules, roles, locks, the rhythm of decisions.

Products

Producers of three product lines

Tourism · houses · apartments.

Objects

Project conductor · supervisor · chief engineer

On every object, on the contractor's side.

Centers

Heads of the eleven centers

Open roles — for partners.

For partners

Connect to realisation

Factories, designers, crews, suppliers, developers, investors, municipalities, universities. Tell us who you are and what you are ready to do — we answer with a first step, not a brochure.

Member
€500/ year

Profile in the catalogue, partner mark, priority requests.

Partner
€2,000/ year

Products in the type library, the working group of your field.

Founding
€10,000/ year

Partner council, demo house and first party, status for good.

No category exclusivity is sold. The benefits are refined as we launch.